Differences
This shows you the differences between two versions of the page.
Both sides previous revision Previous revision | Next revision Both sides next revision | ||
meeting2 [2015/05/18 10:06] grenier |
meeting2 [2015/05/18 10:08] grenier |
||
---|---|---|---|
Line 42: | Line 42: | ||
5. Consider large scale studies. This points at the limits of the simulations considering coarse grids. | 5. Consider large scale studies. This points at the limits of the simulations considering coarse grids. | ||
- | A complement to the initial parameter sheet is to be found at | + | |
Action List | Action List | ||
Line 53: | Line 53: | ||
- Provide all TH2 and TH3 results by June 30th (all participants). Please provide for each performance measure and head gradient an ascii file with two columns (time (s); | - Provide all TH2 and TH3 results by June 30th (all participants). Please provide for each performance measure and head gradient an ascii file with two columns (time (s); | ||
- | Important schedule items are that all definitive results are to be provided by the 30th of June 2015; The draft of a common paper will then be provided to the participants in summer for common redaction until the final submission by the end of 2015 | + | A complement to the initial parameter sheet is to be found at {{: |
+ | |||
+ | Important schedule items are that all definitive results are to be provided by the 30th of June 2015. The draft of a common paper will then be provided to the participants in summer for common redaction until the final submission by the end of 2015 |