Differences
This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision Next revision Both sides next revision | ||
meeting2 [2015/05/18 10:09] grenier |
meeting2 [2015/05/18 10:14] grenier |
||
---|---|---|---|
Line 49: | Line 49: | ||
- Provide mathematical expressions for some unclearly defined performance measures (CG on the web site and appended document complementing the parameter sheet) | - Provide mathematical expressions for some unclearly defined performance measures (CG on the web site and appended document complementing the parameter sheet) | ||
- Introduce some complementary performance measures for TH2 and TH3 (same) | - Introduce some complementary performance measures for TH2 and TH3 (same) | ||
- | - Introduce a new performance measure for TH3 (point evolution of temperature, | + | - Introduce a new performance measure for TH3 (point evolution of temperature, |
- | - Provide all code questionnaires on the web site for us to track the origins of discrepancies in the results or understand the performances of our codes (participant access only). | + | - Provide all code questionnaires on the web site to track the origins of discrepancies in the results or understand the performances of our codes ([[participant_labs: |
- Provide all TH2 and TH3 results by June 30th (all participants). Please provide for each performance measure and head gradient an ascii file with two columns (time (s); | - Provide all TH2 and TH3 results by June 30th (all participants). Please provide for each performance measure and head gradient an ascii file with two columns (time (s); | ||
- | The complement to the initial TH2 and TH3 parameter sheets is {{: | ||
Important schedule items are that all definitive results are to be provided by the 30th of June 2015. The draft of a common paper will then be provided to the participants in summer for common redaction until the final submission by the end of 2015 | Important schedule items are that all definitive results are to be provided by the 30th of June 2015. The draft of a common paper will then be provided to the participants in summer for common redaction until the final submission by the end of 2015 |