Line 50: Line 50:
   - Introduce some complementary performance measures for TH2 and TH3 (same)    - Introduce some complementary performance measures for TH2 and TH3 (same) 
   - Introduce a new performance measure for TH3 (point evolution of temperature, see Fig. 1) – refer to the complement to the TH2 and TH3 parameter sheets ({{:th2_3_parameter_sheet_complement.pdf|}}).    - Introduce a new performance measure for TH3 (point evolution of temperature, see Fig. 1) – refer to the complement to the TH2 and TH3 parameter sheets ({{:th2_3_parameter_sheet_complement.pdf|}}). 
-  - Provide all code questionnaires on the web site to track the origins of discrepancies in the results or understand the performances of our codes ([[participant_labs:all|participant pages]], participant access only). +  - Provide all code questionnaires on the web site to track the origins of discrepancies in the results or understand the performances of our codes ([[participant_labs:all|participant pages]], click on the name of the code, participant access only). 
   - Provide all TH2 and TH3 results by June 30th (all participants). Please provide for each performance measure and head gradient an ascii file with two columns (time (s);Performance Measure), separator “;” with names TH2_PMi_GHj and TH3_PMi_GHj   - Provide all TH2 and TH3 results by June 30th (all participants). Please provide for each performance measure and head gradient an ascii file with two columns (time (s);Performance Measure), separator “;” with names TH2_PMi_GHj and TH3_PMi_GHj
  
  
 Important schedule items are that **__all definitive results are to be provided by the 30th of June 2015__**. The draft of a common paper will then be provided to the participants in summer for common redaction until the final submission by the end of 2015 Important schedule items are that **__all definitive results are to be provided by the 30th of June 2015__**. The draft of a common paper will then be provided to the participants in summer for common redaction until the final submission by the end of 2015