Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Last revision Both sides next revision
meeting2 [2015/05/18 10:09]
grenier
meeting2 [2015/05/18 10:17]
grenier
Line 49: Line 49:
   - Provide mathematical expressions for some unclearly defined performance measures (CG on the web site and appended document complementing the parameter sheet)   - Provide mathematical expressions for some unclearly defined performance measures (CG on the web site and appended document complementing the parameter sheet)
   - Introduce some complementary performance measures for TH2 and TH3 (same)    - Introduce some complementary performance measures for TH2 and TH3 (same) 
-  - Introduce a new performance measure for TH3 (point evolution of temperature, see Fig. 1) – refer to the complement to the parameter sheet (appended and on the web site).  +  - Introduce a new performance measure for TH3 (point evolution of temperature, see Fig. 1) – refer to the complement to the TH2 and TH3 parameter sheets ({{:th2_3_parameter_sheet_complement.pdf|}}).  
-  - Provide all code questionnaires on the web site for us to track the origins of discrepancies in the results or understand the performances of our codes (participant access only). +  - Provide all code questionnaires on the web site to track the origins of discrepancies in the results or understand the performances of our codes ([[participant_labs:all|participant pages]], click on the name of the code, participant access only). 
   - Provide all TH2 and TH3 results by June 30th (all participants). Please provide for each performance measure and head gradient an ascii file with two columns (time (s);Performance Measure), separator “;” with names TH2_PMi_GHj and TH3_PMi_GHj   - Provide all TH2 and TH3 results by June 30th (all participants). Please provide for each performance measure and head gradient an ascii file with two columns (time (s);Performance Measure), separator “;” with names TH2_PMi_GHj and TH3_PMi_GHj
  
-The complement to the initial TH2 and TH3 parameter sheets is {{:th2_3_parameter_sheet_complement.pdf|}}  
  
-Important schedule items are that all definitive results are to be provided by the 30th of June 2015. The draft of a common paper will then be provided to the participants in summer for common redaction until the final submission by the end of 2015+Important points of schedule are that **__all definitive results are to be provided by the 30th of June 2015__**. The draft of a common paper will then be provided to the participants in summer for common redaction until the final submission by the end of 2015